|
|
| Madics Software Modules |
| Bill of Materials |
back |
|
|
- Up to 100 sub-levels of assembly structures.
- Assembly structures may contain assemblies, sub assemblies, components, consumables and resource elements.
- Includes percentages uplifts and multi-level totalling.
- Global substitution of components routines automatically replaces obsolete components.
- Drawing references, issue numbers and memo text fields.
- Full top-to-bottom costing for specified assemblies and sub-assemblies.
- Optional labour costing.
- Instant Trial Kitting on a “what if” basis, based on current available stocks.
- Full detailed Kitting Report or shortages only.
- Global component and sub-assembly shortage report.
- Where Used report to identify on screen or report all occurrence’s of given components or sub-assemblies
|
|
|